Case Studies & References

Real projects with measurable results and KPIs.

Note: The following case studies are based on real projects. Names anonymized at the respective clients’ request.


Directly Contactable References

Case Study 1: Over a Decade of Partnership – Projectile Rollouts, Integrations & Continuous Development with Information Desire Software GmbH 100% Success Rate 25–35% Efficiency Gain/Year Scaling to 1,000+ Employees

Context: Over a decade of collaboration with Information Desire Software GmbH, the company behind the ERP/project management software Projectile. Not a single project, but a continuous partnership: countless customer rollouts, custom extensions, interface development, training, and system adaptations.

Challenge:

  • Every customer brings different requirements – Projectile must adapt to the business needs, not the other way around
  • Countless interfaces to third-party systems and continuous development – without disrupting day-to-day operations

My Role (ongoing):

  1. Requirement Engineering: Capturing end-customer requirements, translating them into actionable specifications, and refining iteratively
  2. Custom Extensions: Specifying and overseeing extensions to the Projectile core as well as individual customer-specific adaptations
  3. Interface Specification & Implementation: Interfaces: DATEV, Salesforce, Atlatos, Diamant, Rex, and others – technically implemented via REST API, shadow tables, or file exports; data mapping as a core task in every integration
  4. Rollouts & Training: Onboarding new customers to Projectile, supporting existing customers through version upgrades, training key users
  5. Testing & Go-Live: Structured integration testing, production deployment, monitoring during the first weeks

Results:

  • Success rate: 100% of projects completed successfully (no cancellations, no rollbacks)
  • Interfaces: Countless integrations specified, tested, and deployed to production
  • Process efficiency: Average 25–35% efficiency gain per year at end-customer sites
  • Scaling: Supported customers from 10-person agencies to companies with over 1,000 employees – systems and processes grow with the business
  • Cost control: Under budget through clean specification and planning

Client quote (directly contactable): “Over more than a decade, René and I have successfully delivered countless projects. His pragmatic approach – structured yet flexible – is unique. He strengthens our team instead of replacing it.” – Peter Schaub, CEO Information Desire Software GmbH

Case Study 2: Industry Solution Projectile-HOAI – From Master Thesis to Product Standalone Industry Solution New Customer Segment

Context: Architecture and engineering firms work according to the HOAI (German Fee Structure for Architects and Engineers). Billing by service phases, fee zones, and eligible costs is complex and error-prone. No solution existed that could map this seamlessly into Projectile.

Challenge:

  • HOAI fee calculation is regulatorily complex (service phases 1–9, fee zones, renovation surcharges, ancillary costs)
  • Existing solutions were either pure billing tools without project management or ERP systems without HOAI capabilities
  • Engineering and planning firms needed both: project management and HOAI-compliant fee processing in one system

My Role:

  1. Functional Specification: Based on my Master Thesis on the HOAI topic (International Management program), I translated all regulatory requirements into actionable system specifications
  2. Product Definition: Together with IDS, defined the industry solution as a standalone module in Projectile – from fee calculation to service phase tracking to final invoicing
  3. Testing & Validation: Verification against real project data from engineering firms
  4. Market Launch: Supported the first customer rollouts

Results:

  • Projectile-HOAI launched as a standalone industry solution on the market
  • HOAI-compliant fee calculation directly within the ERP – no more media discontinuity
  • Engineering and planning firms can manage project control and billing in a single system
  • Foundation for opening up a new customer segment for IDS

Client quote (directly contactable): Reference via Peter Schaub, CEO Information Desire Software GmbH (see Case Study 1)

Case Study 3: Production Optimization & Project Management – ZARGES GmbH +18% Throughput Overruns 35% → 8% 16 Weeks

Context: Internationally operating corporate group (ZARGES GmbH, Dresden site). Challenge: production processes had grown organically, not by design. Project management lacked structure.

Challenge:

  • Production processes inefficient, many manual steps
  • Project management: everything ad-hoc, schedule overruns frequent
  • No transparency on costs and capacity

Approach (16 weeks):

  1. Process Audit: Documenting actual workflows (not theoretical ones)
  2. Project Management Structure: Implementing a pragmatic PMO
  3. Training & Handover: Enabling the team to continue independently
  4. Quick Wins: First efficiencies visible by week 3/4

Results:

  • Production efficiency: +18% throughput in 16 weeks
  • Project accuracy: Schedule overruns reduced from 35% → 8% within 6 months
  • Cost monitoring: Automated cost tracking (previously: Excel chaos)
  • Team adoption: PMO structure is lived, not resented
  • Scalable: System holds when growth comes

Client quote (directly contactable): “René transformed our project management from ad-hoc to structured – without overhead. Production runs smoother, costs are more transparent, and the team knows what it’s working toward.” – Marc Meschenmoser, Operational Site Manager ZARGES GmbH, Dresden


Further Projects with Measurable Results

Case Study 4: ERP Migration at a Pharmaceutical Company 99.7% Data Integrity 75% Reporting Efficiency 5% Under Budget

Context: Mid-market company (250 employees) in the pharma sector, consisting of multiple divisions with separate systems. Goal: consolidation onto a single ERP system (SAP).

Challenge:

  • 3 legacy ERP systems, different data structures
  • Finance needed a centralized reporting structure
  • Change resistance in Operations (department managers feared loss of control)

Approach (16 weeks):

  1. Analysis & Requirements (Wk 1–4): Process documentation, data mapping, identification of problem areas
  2. Fit-to-Standard & Design (Wk 5–8): SAP configuration, decision points, change management plan
  3. Data Validation & Rollout (Wk 9–16): Data quality checks, 2-wave go-live, training

Results:

  • On schedule: Exactly 16 weeks (vs. estimated 18–20 weeks)
  • Data migration: 99.7% data integrity (only 45 out of 15,000 records manually corrected)
  • Reporting: Report generation reduced from 8 hrs/week manual to 2 hrs/week (75% efficiency gain)
  • User adoption: 94% active users after 4 weeks (industry average: ~70%)
  • Cost control: 5% under budget (savings of approx. €18,000)

Client quote (anonymized): “René managed to get Finance and Operations to the same table. That’s rare. The go-live was stress-free – because everything was prepared.” – CFO, Pharmaceutical Company

Case Study 5: Data Migration & System Consolidation Post-M&A 99.3% Data Integrity Weekend Cut-Over No Rollback

Context: Acquisition: international corporation acquires a mid-market company (80 employees) from the consulting sector. Goal: integrate all systems and data into the corporate landscape.

Challenge:

  • Legacy systems were undocumented
  • Two different cost accounting models
  • Cut-over had to happen over a single weekend (no business interruption)

Approach (12 weeks + 1 go-live weekend):

  1. Discovery Phase (Wk 1–4): Reverse-engineering legacy systems, documenting all interfaces
  2. Mapping & Testing (Wk 5–10): Detailed data mapping, multiple test runs
  3. Go-Live Prep (Wk 11–12): Writing runbooks, training the team
  4. Weekend Cut-Over: Live migration Friday 6:00 PM → Monday 8:00 AM

Results:

  • Go-live: Successfully executed over one weekend, zero business disruption
  • Data integrity: 99.3% match between source and target systems
  • Reconciliation time: Finance reconciliation reduced from 3 days to 6 hours (95% automated)
  • No rework: No critical errors, no rollback required
  • Cost: Exactly at the agreed fixed price

Client quote (anonymized): “In other mergers, the go-lives were chaotic. With René’s planning, everything ran like clockwork – we knew exactly what would happen, when it would happen, and what could go wrong. Nothing went wrong.” – Team Member Integration, M&A Project


Workshops & Training

Delivered:

  • 12+ intensive workshops (ERP, data migration, M&A integration, AI in Finance)
  • Average participant satisfaction: 4.7/5.0
  • Frequent feedback: “Practical, no buzzwords, immediately applicable”

Sample Feedback:

“Best part: no PowerPoint marathon. Instead: working through real scenarios, finding solutions together, taking checklists we can use tomorrow.” – Finance Manager, TÜV


References & Contact

Want to speak with clients directly? I’m happy to make introductions, or you can contact them directly:

  • Peter Schaub, CEO Information Desire Software GmbH – Long-term partnership, Projectile rollouts & HOAI industry solution (Case Study 1 & 2)
  • Marc Meschenmoser, Operational Site Manager ZARGES GmbH, Dresden – Production optimization & project management (Case Study 3)

Get in touch for further references

Interested?

Let's discuss how I can help in a short conversation.